The Effective Management of Time in Complex Projects

We are what we repeatedly do. Excellence, then, is not an act but a habit..
Aristotle

Keywords: Schedule, Float, Critical Path. 

Return to Main Paper Index

Return to Alphabetical Paper Index

The Effective Management of Time in Complex Projects   [P130]

The IT industry’s inability to effectively manage time has been widely documented. Other industries are no better, if the Burj Khalifa in Dubai had been built at the same speed as the Empire State Building (completed in 1931) it would have opened two years earlier!  Research by the CIOB undertaken in 2007  found most complex/mega projects failed to adequately mange time, most finished late and the situation was getting worse over time.  Interestingly, the degree of failure seems to be the same regardless of the size of the penalties imposed for late completion and regardless of the form of contract used. PPP, Alliance, Partnering, D&C, and traditional forms of contract all experienced similar trends and similar levels of failure.

What the CIOB research did uncover was the significant difference in performance between simple and complex projects and on complex projects, between those using effective time management compared to those that did not. The research found:
In response to this challenge, the CIOB assembled an international team of project planning and scheduling experts (including the author) under the leadership of the then IPP, Keith Pickavance, to implement a three-phase strategy to provide the required standards of performance in effective time control.  Phase 1 focuses on the education training and accreditation of project schedulers; it includes:
Phase 2 will focus on the promotion of amendments to standard forms of contract to facilitate effective time management. Followed by Phase 3, which will focus on the education, training and accreditation of project planners.

The Guide has introduced a range of practical ideas to enhance the effective management of time in mega-projects which will be the focus of this paper:
CIOB research has clearly demonstrated time is not money and the effective management of the use of time cannot be achieved by measuring cost performance or imposing cost penalties.  The team that developed the Guide have between them, well over 100 years of experience managing time on major projects world-wide. This paper identifies the key elements within the Guide that proactively contribute to the successful delivery of mega projects and relate these ideas to the practical management of Information technology projects.

Author: Patrick Weaver

MSCPMP Circle - QF4
14th October 
Kuala Lumpur, Malaysia

Download paper

Download the presentation


Home - Contact Us - Site Map - Company - Training - Consulting - Resources - Legals


Tel: (03) 9696 8684
.Intl: +613 9696 8684

Copyright © 2010 Practical PM Pty. Ltd.
All rights reserved.
Important legal notices, disclaimer and trademark attributions.